PALLADA GROUP Office

Location

6 Baumanskaya Str., Moscow.

Duration

2 weeks.

Works performed

Installation of engineering systems.

Following the order by PALLADA GROUP LLC our company carried out complete installation of power supply and ventilation systems.

We conducted electrical works including cable pulling in corrugated pipes, installation of cable-channels, and installation of sockets, luminaries and distribution panel with metering unit.

Within the scope of the ongoing rearrangement the ventilation system was reorganized by tapping it into the existing system with the replacement of ceiling diffusers.