Sandvik-MKTS JSC

Location

1, Polkovaya str., Moscow.

Duration

2 months.

Works performed

Int-Ext specialists carried out repairs of Sandvik-MKTS JSC warehouse. Fit-out works were implemented in time and with modern materials. Adjustment of MEP systems included pulling of structured cabling system, electrical installation works, technology pipeline installation.

Aside from work on the engineering systems, Int-Ext specialists removed the old fit-out and then plasterboarded the walls and ceilings. Painting was done and laying of the industrial flooring completed. New window sills and combined office partitions were installed to maximally optimize the workspace; the windows were fitted with vertical blinds fabric.

Start chat